Utilize este identificador para referenciar este registo:
https://hdl.handle.net/1822/38861
Título: | Prevention in underground construction with sequential excavation method |
Autor(es): | Tender, M. Couto, J. Pedro Ferreira, T. P. |
Palavras-chave: | Prevention in underground construction Safety Construction Sequential Excavation Method |
Data: | Fev-2015 |
Editora: | Taylor and Francis |
Citação: | Tender M., Couto J. P., Ferreira T. P. Prevention in Underground Construction with Sequential Excavation Method, Occupational Safety and Hygiene III, Issue Vol 1, pp. 421-424, 978-1-138-02765-7, 2015 |
Resumo(s): | This paper aims to describe the Sequential Excavation Method, used for excava-tion in underground works, as well as the related risks and preventive measures. This method has characteristics that differentiate it from other tunnelling techniques: it uses a larger number of workers and equipment; it has a high concurrency of tasks with various workers and equip-ment quite exposed to hazards; and it uses many potentially aggressive chemicals. Firstly, it is given a broad overview of this issue. Afterwards, it will be presented the results of a survey to a sample of experienced technicians, aimed at gauging the relevance of a set of guidelines relat-ing to the design and work phases, applicable to the domestic market and prepared following technical visits to works abroad. |
Tipo: | Artigo em ata de conferência |
URI: | https://hdl.handle.net/1822/38861 |
ISBN: | 978-1-138-02765-7 |
Versão da editora: | https://www.crcpress.com/Occupational-Safety-and-Hygiene-III/Arezes-Baptista-Barroso-Carneiro-Cordeiro-Costa-Melo-Miguel-Perestrelo/9781138027657#googlePreviewContainer |
Arbitragem científica: | yes |
Acesso: | Acesso restrito UMinho |
Aparece nas coleções: | C-TAC - Capítulos/Artigos em Livros Internacionais |
Ficheiros deste registo:
Ficheiro | Descrição | Tamanho | Formato | |
---|---|---|---|---|
2155-full paper sho 2015.pdf Acesso restrito! | 572,65 kB | Adobe PDF | Ver/Abrir |