Utilize este identificador para referenciar este registo: https://hdl.handle.net/1822/68530

TítuloLife cycle costs. The importance of the users’ costs
Autor(es)Almeida, J. C.
Brito, J.
Cruz, Paulo J. S.
Palavras-chaveBridge management system
deterioration
repair
life cycle costs
users’ costs
Data2019
EditoraInternational Association for Bridge and Structural Engineering (IABSE)
Resumo(s)The aim of this paper is to present a methodology that allows the quantification of the users’ costs in bridge life cycle costs analysis. This model, created for concrete roadway bridges, allows the quantification of the users’ costs in a swift and intuitive way. The considered items for the quantification of the costs are: vehicle operation, time, accidents and tolls when applicable. This method, implemented along with a deterioration model, allows the quantification of the users’ costs for different material alternatives of reinforced concrete bridges. The users’ costs are quantified with the comparison of the costs corresponding to a free flow condition with those that result from the scenario of the creation of work zones. The users’ costs quantification methodology allows the definition of recommendations concerning the design and construction stages of concrete roadway bridges with the aim of minimizing the life cycle costs.
TipoArtigo em ata de conferência
URIhttps://hdl.handle.net/1822/68530
ISBN9783857481635
Arbitragem científicayes
AcessoAcesso restrito UMinho
Aparece nas coleções:Lab2PT - Atas de Congresso/ Papers in conference proceedings

Ficheiros deste registo:
Ficheiro Descrição TamanhoFormato 
Paper IABSE 2019.pdf
Acesso restrito!
763,16 kBAdobe PDFVer/Abrir

Partilhe no FacebookPartilhe no TwitterPartilhe no DeliciousPartilhe no LinkedInPartilhe no DiggAdicionar ao Google BookmarksPartilhe no MySpacePartilhe no Orkut
Exporte no formato BibTex mendeley Exporte no formato Endnote Adicione ao seu ORCID