Data | Título | Autor(es) | Tipo | Acesso |
2018 | Collaborative paradigm for single-machine scheduling under just-in-time principles: total holding-tardiness cost problem | Varela, M.L.R.; Madureira, Ana M.; Dantas, Joana D., et al. | Artigo | Acesso restrito UMinho |
5-Out-2018 | A new approach for real time train energy efficiency optimization | Rocha, Agostinho; Araújo, Armando; Carvalho, Adriano, et al. | Artigo | Acesso aberto |
2014 | Scheduling in product oriented manufacturing systems: Comparing hybrid flowshop with parallel-machine flowshop - an industrial study | Costa, N. M. L.; Varela, M.L.R.; Carmo-Silva, S. | Artigo em ata de conferência | Acesso restrito UMinho |
2014 | Scheduling single-machine problem based on just-in-time principles: a case study | Dantas, Joana D.; Varela, M.L.R. | Artigo em ata de conferência | Acesso restrito UMinho |
12-Jul-2022 | A statistical comparison of metaheuristics for unrelated parallel machine scheduling problems with setup times | Antunes, Ana Rita; A. Matos, Marina; Rocha, Ana Maria A. C., et al. | Artigo | Acesso aberto |