Utilize este identificador para referenciar este registo: https://hdl.handle.net/1822/19119

Registo completo
Campo DCValorIdioma
dc.contributor.authorAfonso, Celina-
dc.contributor.authorAlves, Anabela Carvalho-
dc.date.accessioned2012-05-04T13:47:39Z-
dc.date.available2012-05-04T13:47:39Z-
dc.date.issued2009-
dc.identifier978-972-8826-22-2en_US
dc.identifier.citationAfonso, Celina; Alves, Anabela Carvalho. Implementation of the Pull Levelling project in a car radio assembly firm, Trabalho apresentado em 3rd International Conference on Integrity, Reliability and Failure (IRF2009), In Proceedings of the 3rd International Conference on Integrity, Reliability and Failure (IRF2009), Porto, 2009.en_US
dc.identifier.urihttps://hdl.handle.net/1822/19119-
dc.description.abstractThis paper presents some results from the implementation of pull levelling strategy between the final assembly lines and the Original Equipment Manufacturing (OEM) clients of a car radio assembly firm. In order to respond quickly to the clients the firm maintained a stock level of, approximately, ten days of finished product for each client. This implies high costs for the firm. The implementation of the pull levelling strategy reduced these costs and increased the flexibility approaching the production to the demand, in quantity and in diversity, required by the clients. Additionally, this implementation permitted the detection of deviation, identification of problems, creation of standards and continuous improvement, stabilization of the upstream processes and the reduction of components stock. The performance indicators used by the firm to measure the performance of this implementation were the fulfillment (the achievement of the production levelling plan supplied by the Production Planning Department), the stock level, the Every Part Every Interval (EPEI) number and LIWAKS (accomplishment of the due date negotiate with the client).por
dc.language.isoporpor
dc.rightsopenAccesspor
dc.subjectSistema pullpor
dc.subjectLevellingpor
dc.titleImplementation of the pull levelling project in a car radio assembly firmpor
dc.typeconferencePaper-
dc.peerreviewednopor
sdum.publicationstatuspublishedpor
oaire.citationConferenceDate20-24 July 2009por
oaire.citationConferencePlacePorto - Portugalpor
oaire.citationTitle3rd International Conference on Integrity, Reliability and Failurepor
dc.date.updated2012-04-25T10:10:10Z-
sdum.conferencePublication3rd International Conference on Integrity, Reliability and Failurepor
Aparece nas coleções:CGIT - Publicações em actas de encontros científicos / Papers in conference proceedings
CITEPE - Publicações em actas de encontros científicos / Papers in conference proceedings

Ficheiros deste registo:
Ficheiro Descrição TamanhoFormato 
2009IRF_CA_AA_P0289.pdf460,09 kBAdobe PDFVer/Abrir

Partilhe no FacebookPartilhe no TwitterPartilhe no DeliciousPartilhe no LinkedInPartilhe no DiggAdicionar ao Google BookmarksPartilhe no MySpacePartilhe no Orkut
Exporte no formato BibTex mendeley Exporte no formato Endnote Adicione ao seu ORCID