Utilize este identificador para referenciar este registo:
https://hdl.handle.net/1822/50589
Título: | Statistical Process Control automation in the final inspection process: an industrial case study |
Autor(es): | Guerra, L. Sousa, Sérgio Nunes, Eusébio P. |
Palavras-chave: | Automation Final inspection Quality assurance Statistical process control Variability |
Data: | 1-Dez-2016 |
Editora: | IEEE |
Revista: | IEEE International Conference on Industrial Engineering and Engineering Management |
Citação: | Statistical Process Control Automation in the Final Inspection Process: An Industrial Case Study |
Resumo(s): | This case study arises from the need to make more robust and effective quality assurance procedures of the products by automating the final inspection process. The case study explains how the automation of the inspection process was performed in a company from the automotive sector. Knowledge, involvement and commitment of operators and respective managers should not be neglected because their reaction against the change procedures influence the success of any automation performed. The successful introduction of automation contributed to a more efficient process and from the pilot station to the remaining stations problem solving and continuous improvement was evidenced. |
Tipo: | Artigo em ata de conferência |
URI: | https://hdl.handle.net/1822/50589 |
ISBN: | 9781509036653 |
DOI: | 10.1109/IEEM.2016.7798002 |
e-ISSN: | 2157-362X |
Versão da editora: | http://ieeexplore.ieee.org/abstract/document/7798002/?reload=true |
Arbitragem científica: | yes |
Acesso: | Acesso aberto |
Aparece nas coleções: |
Ficheiros deste registo:
Ficheiro | Descrição | Tamanho | Formato | |
---|---|---|---|---|
IEEM16-P-0667_FinalPDF.pdf | 212,09 kB | Adobe PDF | Ver/Abrir |