Utilize este identificador para referenciar este registo: https://hdl.handle.net/1822/50927

TítuloShortening Changeover Time - An Industrial Study
Autor(es)Trojanowska, Justyna
Zywicki, Krzysztof
Varela, Maria Leonilde Rocha
Machado, José
Palavras-chavesingle minute exchange of die method
fiberboard manufacturing
lean manufacuring
Data2015
EditoraIEEE
RevistaIberian Conference on Information Systems and Technologies (CISTI)
Resumo(s)This paper presents the results of the use of the Single Minute Exchange of Die method to shorten changeover time on machines in a polish production company. This project has been developed for a manufacturing company, whose products are fiberboard, hardboard and softboard products manufactured by a highly specialized industry using only pure wood fibers. Long changeover times used to conduct to bad results in timely delivery of orders. Therefore, in this work each element of the changeover time was analyzed to understand if it could be eliminated, moved or simplified. Implemented solutions significantly reduce setup time and improve the Company's competitiveness.
TipoArtigo em ata de conferência
URIhttps://hdl.handle.net/1822/50927
ISBN9789899843455
DOI10.1109/CISTI.2015.7170373
ISSN2166-0727
Arbitragem científicayes
AcessoAcesso aberto
Aparece nas coleções:CAlg - Artigos em livros de atas/Papers in proceedings

Ficheiros deste registo:
Ficheiro Descrição TamanhoFormato 
07170373ShorteningChangeover.pdf2,43 MBAdobe PDFVer/Abrir

Partilhe no FacebookPartilhe no TwitterPartilhe no DeliciousPartilhe no LinkedInPartilhe no DiggAdicionar ao Google BookmarksPartilhe no MySpacePartilhe no Orkut
Exporte no formato BibTex mendeley Exporte no formato Endnote Adicione ao seu ORCID