Utilize este identificador para referenciar este registo: https://hdl.handle.net/1822/72027

Registo completo
Campo DCValorIdioma
dc.contributor.authorSilva, Q.por
dc.contributor.authorLourenço, E.por
dc.contributor.authorMartins, Carla I.por
dc.date.accessioned2021-04-16T17:00:37Z-
dc.date.available2021-04-16T17:00:37Z-
dc.date.issued2020-
dc.identifier.isbn978-989549110-0por
dc.identifier.urihttps://hdl.handle.net/1822/72027-
dc.description.abstractPurpose. In the present work DMAIC methodology is implemented in a Portuguese enterprise. The main goal is to reduce the percentage of non-conformities in an injection molded part for the automotive industry, through the elimination of defects that appear after painting. Design/methodology/approach. The DMAIC method was adopted to find an optimal set of factors that reduce the existing non-conformities. Along the five DMAIC phases, different quality tools were implemented to identify the root causes of the problem and to develop an action plan to reduce defects and minimize the process variability. Findings. In the application of this method, teamwork and brainstorming were essential for satisfactory results in a short period of time. A key finding is that the analysis of the possible causes that gave rise to the problem must be carried out separately, in order to easily identify the changes that created a significant improvement in the process. Research limitations/implications. The project is not fully completed since some of the improvement actions are being implemented. Originality/value. This paper describes a practical application of DMAIC methodology that contributed to reduce part defects and improve the production process of a Portuguese company.por
dc.description.sponsorshipThe authors would like to acknowledge Fehst Componentes, Lda. for providing physical, technical and human resources and to be strongly involved on the development of this study; to the founds provide by National Funds through FCT - Portuguese Foundation for Science and Technology, References UIDB/05256/2020 and UIDP/05256/2020.por
dc.language.isoengpor
dc.publisherUniversidade do Minhopor
dc.relationUIDB/05256/2020por
dc.relationUIDP/05256/2020por
dc.rightsopenAccesspor
dc.subjectDMAICpor
dc.subjectNon-conformingpor
dc.subjectQuality improvementpor
dc.titleApplication of DMAIC method in an industrial case studypor
dc.typeconferencePaperpor
dc.peerreviewedyespor
oaire.citationConferenceDate21 - 22 September 2020por
sdum.event.title574th International Conference on Quality Engineering and Management, ICQEM 2020por
sdum.event.typeconferencepor
oaire.citationStartPage47por
oaire.citationEndPage57por
oaire.citationConferencePlaceBraga, Portugalpor
oaire.citationVolume2020-Septemberpor
dc.subject.fosEngenharia e Tecnologia::Engenharia dos Materiaispor
sdum.conferencePublicationInternational Conference on Quality Engineering and Managementpor
Aparece nas coleções:IPC - Textos completos em actas de encontros científicos internacionais com arbitragem

Ficheiros deste registo:
Ficheiro Descrição TamanhoFormato 
Application of DMAIC method in an industrial case study.pdf366,56 kBAdobe PDFVer/Abrir

Partilhe no FacebookPartilhe no TwitterPartilhe no DeliciousPartilhe no LinkedInPartilhe no DiggAdicionar ao Google BookmarksPartilhe no MySpacePartilhe no Orkut
Exporte no formato BibTex mendeley Exporte no formato Endnote Adicione ao seu ORCID