Utilize este identificador para referenciar este registo: https://hdl.handle.net/1822/80395

TítuloMelhoria do Sistema de Gestão Ambiental da Efacec: Plano de Gestão Ambiental e Avaliação do Ciclo de Vida
Outro(s) título(s)Improvement of Efacec’s Environmental Management System: Environmental Management Plan and Life Cycle Assessment
Autor(es)Lopes, Mariana Raquel Machado
Orientador(es)Pereira, Maria Olívia
Palavras-chaveAcompanhamento ambiental
Gestão Ambiental
Impacte Ambiental
QC45
Environmental Management
Environmental Monitoring
Environmental Impact
Data22-Mar-2021
Resumo(s)O trabalho desenvolvido teve como objetivo enriquecer o Sistema de Gestão Ambiental da Efacec, através da criação de um modelo de Plano de Gestão Ambiental abrangente e da realização da Avaliação do Ciclo de Vida de um carregador de veículos elétricos, o QC45. Relativamente ao Plano de Gestão Ambiental, procedeu-se à análise e reestruturação dos planos previamente elaborados. Posteriormente, fez-se uma seleção e atualização de toda a informação presente, revisão dos capítulos e adaptação dos anexos. As principais alterações foram feitas nos capítulos referentes à caracterização do projeto e ao Sistema de Gestão e Acompanhamento Ambiental. Neste, foi criado um Relatório Mensal de Acompanhamento Ambiental e definidas as condições para a Equipa de Acompanhamento Ambiental. Foram, também, criados anexos de um modelo de relatório mensal, relatórios de visita e registos de ocorrências. Deste modo, elaborou-se um documento mais abrangente e completo, passível de ser aplicado a qualquer projeto da empresa. Para o estudo da Avaliação do Ciclo de Vida do QC45 foi utilizada uma adaptação da ferramenta Ecolizer 2.0. Por ser um produto solicitado por diversos clientes, considerou-se um cliente nacional e outro internacional, a fim de tornar o trabalho mais abrangente. A recolha de dados das fases do ciclo de vida do carregador (produção, utilização e fim de vida) teve por base o ano de 2019 e foi considerado um período de vida útil de 10 anos e um funcionamento de 3 h/d. Analisando os resultados, constatou-se que o produto tem um impacte ambiental de 7,29E+06 mPt (milipontos) no caso do cliente nacional e 7,15E+06 mPt no caso do internacional, diferença que se deve, sobretudo, ao indicador de eletricidade utilizado, que é superior para o cliente nacional. Mais de 60 % do impacte deveu-se à fase de produção, nomeadamente, ao consumo de materiais. A fase com menos impacte ambiental foi a de fim de vida e o aspeto ambiental foi o consumo de energia na fase de produção. Apesar das circunstâncias atuais e de algumas limitações, do trabalho desenvolvido resultaram dois importantes contributos para o Sistema de Gestão Ambiental da Efacec e para o controlo do seu impacte ambiental.
The work developed aimed to improve Efacec’s Environmental Management System, through the elaboration of a general Environmental Management Plan and the development of a Life Cycle Assessment of an electric vehicles charger, the QC45. Regarding the Environmental Management Plan, an analysis and restructuring of previously elaborated plans was carried out. Afterwards, the present information was selected and updated, the chapters were reviewed, and the annexes were adapted. The main changes were made in the chapters regarding the characterization of the project and the Environmental Monitoring and Management System. In this chapter, an Environmental Monitoring monthly report was created and the conditions for an Environmental Monitoring Team were defined. Annexes of a monthly report template, visit reports and occurrences report were also created. In this way, a more comprehensive and complete document was developed, which can be applied to any project of the company. The tool used for the Life Cycle Assessment of QC45 was an adaptation of Ecolizer 2.0. As it is a product requested by several clients, was considered a national and an international client, in order to make the work more comprehensive. The data collected from the life cycle phases of the charger (production, use and end of life) was based on the year 2019 and was considered a useful life period of 10 years and a 3 h/d operation. Analyzing the results, it was found that the product has an environmental impact of 7.29E+06 mPt (millipoints) for the national client and 7.15E+06 mPt for the international client, whose difference is due, mostly, to the electricity indicator, which is superior to the national client. More than 60 % of the impact was due to the production phase, namely materials consumption. The phase with less environmental impact was the end of life and the environmental aspect was the energy consumption in the production phase. Despite the current circumstances and some limitations, the developed work resulted in two important contributions to Efacec’s Environmental Management System and for its environmental impact control.
TipoDissertação de mestrado
DescriçãoDissertação mestrado integrado em Engenharia Biológica
URIhttps://hdl.handle.net/1822/80395
AcessoAcesso aberto
Aparece nas coleções:BUM - Dissertações de Mestrado
CEB - Dissertações de Mestrado / MSc Dissertations

Ficheiros deste registo:
Ficheiro Descrição TamanhoFormato 
Mariana Raquel Machado Lopes.pdfDissertação de mestrado1,22 MBAdobe PDFVer/Abrir

Este trabalho está licenciado sob uma Licença Creative Commons Creative Commons

Partilhe no FacebookPartilhe no TwitterPartilhe no DeliciousPartilhe no LinkedInPartilhe no DiggAdicionar ao Google BookmarksPartilhe no MySpacePartilhe no Orkut
Exporte no formato BibTex mendeley Exporte no formato Endnote Adicione ao seu ORCID