Utilize este identificador para referenciar este registo: https://hdl.handle.net/1822/86755

Registo completo
Campo DCValorIdioma
dc.contributor.authorKaraz, Mahmoudpor
dc.contributor.authorTeixeira, José M. Cardosopor
dc.date.accessioned2023-10-10T08:19:17Z-
dc.date.available2023-10-10T08:19:17Z-
dc.date.issued2023-06-
dc.identifier.urihttps://hdl.handle.net/1822/86755-
dc.description.abstractTraditional planning and control methods do not accurately reflect the construction reality and lack feedback loops. The Last Planner System (LPS) and Location-based Management System (LBMS) have been suggested as socio-technical systems to generate practical and actionable real-life data based on production theories and logic. This data can be effectively communicated, analysed, and managed using the capabilities offered by Building Information Modelling (BIM) workflows. However, a true integration between Lean Construction-BIM is not yet matured, where parallel use of both concepts is still more common. This paper presents a conceptual framework based on a system dynamic modelling approach to elaborate a causal loop diagram (CLD). The CLD explores the interactions between basic management functions and waste, on this basis this paper proposes how the integration between LPS, LBMS, and BIM can be harnessed to apply waste elimination strategies. The results of this study can be applied as lean policy analysis for new lean adaptors to understand the impact of Lean-BIM for planning and controlling various wastes across the construction supply chainpor
dc.description.sponsorshipThis work is funded by National Funds through the FCT - Fundação para a Ciência e Tecnologia, I.P., under the scope of the project 2021.04751.BDpor
dc.language.isoengpor
dc.publisherInternational Group for Lean Construction (IGLC)por
dc.relation2021.04751.BDpor
dc.rightsopenAccesspor
dc.subjectLast planner systempor
dc.subjectLocation-based-managementpor
dc.subjectSystem dynamicspor
dc.subjectCasual loop diagrampor
dc.subjectConstruction wastepor
dc.subjectBuilding information modellingpor
dc.titleA system dynamic modelling approach for integrated lean-BIM planning and control methodspor
dc.typeconferencePaperpor
dc.peerreviewedyespor
dc.relation.publisherversionhttps://doi.org/10.24928/2023/0170por
sdum.event.title31st Annual Conference of the International Group for Lean Construction (IGLC31)por
sdum.event.typeconferencepor
oaire.citationConferencePlaceLille, Francepor
dc.identifier.doi10.24928/2023/0170por
dc.subject.fosEngenharia e Tecnologia::Engenharia Civilpor
sdum.conferencePublicationProceedings of the 31st Annual Conference of the International Group for Lean Construction (IGLC31)por
dc.subject.odsProdução e consumo sustentáveispor
Aparece nas coleções:C-TAC - Comunicações a Conferências Internacionais


Partilhe no FacebookPartilhe no TwitterPartilhe no DeliciousPartilhe no LinkedInPartilhe no DiggAdicionar ao Google BookmarksPartilhe no MySpacePartilhe no Orkut
Exporte no formato BibTex mendeley Exporte no formato Endnote Adicione ao seu ORCID