Utilize este identificador para referenciar este registo: https://hdl.handle.net/1822/53145

TítuloFast heuristics for integrated planning and scheduling
Autor(es)Rietz, Jurgen Endre
Alves, Cláudio
Valério de Carvalho, José Manuel
Palavras-chavePlanning
Scheduling
Heuristics
Low complexity
Data2015
EditoraSpringer Verlag
RevistaLecture Notes in Computer Science
Resumo(s)In this paper, we address the integrated planning and scheduling problem on parallel machines in which a set of jobs with release and due-dates have to be assigned first to consecutive time periods within the planning horizon, and then scheduled on the available machines. We explore in particular different alternative low complexity heuristics. The importance of job sequencing in the performance of these heuristics is analyzed, and a new property characterizing the optimal solutions of the problem is described. We also present a heuristic that yields optimal solutions for specific instances of the problem, and local exchange procedures that proved to be effective. To the best of our knowledge, these are the first contributions concerning the heuristic solution of this integrated planning and scheduling problem through low complexity procedures. To evaluate performance of these heuristics, we report on extensive computational experiments on benchmark instances of the literature.
TipoArtigo em ata de conferência
URIhttps://hdl.handle.net/1822/53145
ISBN9783319214061
DOI10.1007/978-3-319-21407-8_30
ISSN0302-9743
Arbitragem científicayes
AcessoAcesso restrito UMinho
Aparece nas coleções:CAlg - Livros e capítulos de livros/Books and book chapters

Ficheiros deste registo:
Ficheiro Descrição TamanhoFormato 
Fast heuristics for integrated planning and scheduling.pdf
Acesso restrito!
176,14 kBAdobe PDFVer/Abrir

Partilhe no FacebookPartilhe no TwitterPartilhe no DeliciousPartilhe no LinkedInPartilhe no DiggAdicionar ao Google BookmarksPartilhe no MySpacePartilhe no Orkut
Exporte no formato BibTex mendeley Exporte no formato Endnote Adicione ao seu ORCID