Utilize este identificador para referenciar este registo:
https://hdl.handle.net/1822/5456
Título: | Experimental results of an adaptive resource allocation |
Autor(es): | Tereso, Anabela Pereira Araújo, Maria Madalena Teixeira de Elmaghraby, Salah |
Palavras-chave: | Operations planning and Scheduling Activity networks Resource allocation Dynamic programming |
Data: | Mai-2003 |
Citação: | INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND PRODUCTION MANAGEMENT, Porto, 2003 - "International Conference on Industrial Engineering and Production Management". [S.l. : s.n.], 2003. |
Resumo(s): | We describe the structure and the implementation aspects of the dynamic programming procedure that was proposed in a previous report (Tereso et al., 2001) for the optimal resource allocation to activities under the assumption of stochastic work content. We illustrate its implementation to five projects of varying size, which exhibit the computational complexity of the procedure. The pseudo-code may be obtained by request from the lead author. |
Tipo: | Artigo |
URI: | https://hdl.handle.net/1822/5456 |
Arbitragem científica: | yes |
Acesso: | Acesso aberto |
Aparece nas coleções: | CESP - Textos Completos em Actas de Encontros Científicos Internacionais com Arbitragem |
Ficheiros deste registo:
Ficheiro | Descrição | Tamanho | Formato | |
---|---|---|---|---|
PaperIEPM-APT-MMA-SEE.pdf | Artigo completo | 71,7 kB | Adobe PDF | Ver/Abrir |