Utilize este identificador para referenciar este registo: https://hdl.handle.net/1822/58538

TítuloCOST Action TU1406 and main results on bridge lifecycle management
Autor(es)Matos, José C.
Casas, J. R.
Data2019
EditoraCRC Press
Resumo(s)Life-cycle analyses are used in condition assessment of new and existing bridges, as well as for evaluation of maintenance strategies. Management systems, capturing different degradation processes, are very often used in relation to such life-cycle analyses methods in order to describe the actual and future condition. During the implementation of asset management strategies, maintenance actions are required to keep assets at desired performance levels. In case of roadway bridges, performance indicators are established for components, which alongside with the definition of standardized performance goals, allow to assess the accomplishment of quality control plans. In Europe there is a large disparity regarding the way performance indicators are quantified and goals specified. Therefore, a discussion at a European networking level, seeking to achieve a standardized approach in this subject, will bring significant benefits. COST Action TU1406 aims to achieve such goal by bringing together both research and practicing communities in order to establish a European guideline in this matter.
TipoArtigo em ata de conferência
URIhttps://hdl.handle.net/1822/58538
ISBN9781138626331
Arbitragem científicayes
AcessoAcesso restrito autor
Aparece nas coleções:ISISE - Artigos em Revistas Internacionais

Ficheiros deste registo:
Ficheiro Descrição TamanhoFormato 
25.pdf
Acesso restrito!
494,14 kBAdobe PDFVer/Abrir

Partilhe no FacebookPartilhe no TwitterPartilhe no DeliciousPartilhe no LinkedInPartilhe no DiggAdicionar ao Google BookmarksPartilhe no MySpacePartilhe no Orkut
Exporte no formato BibTex mendeley Exporte no formato Endnote Adicione ao seu ORCID