Utilize este identificador para referenciar este registo: https://hdl.handle.net/1822/70569

Registo completo
Campo DCValorIdioma
dc.contributor.advisorCouto, J. Pedropor
dc.contributor.advisorLino, José Carlospor
dc.contributor.authorVaz, Bruno Miguel Serinopor
dc.date.accessioned2021-03-08T15:13:18Z-
dc.date.available2021-03-08T15:13:18Z-
dc.date.issued2017-
dc.date.submitted2017-
dc.identifier.urihttps://hdl.handle.net/1822/70569-
dc.descriptionDissertação de mestrado integrado em Engenharia Ciivilpor
dc.description.abstractAs tecnologias de informação têm evoluído de forma significativa, influenciando, de forma mais ou menos homogénea, todos os setores. O setor da construção não é exceção, mas enfrenta alguns desafios tecnológicos, nomeadamente no uso de software separado, que se traduz num entrave à produtividade do setor (Martins, 2009). O BIM surge como uma aplicação tecnológica que procura responder a este problema, permitindo uma maior interação entre todos os intervenientes, uma melhor execução de projetos especialmente complexos, a antecipação de conflitos evitando possíveis erros e omissões e ainda um melhor planeamento e controlo de obras. Num mercado cada vez mais competitivo, as empresas de construção necessitam de automatizar tarefas e processos, bem como de métodos mais eficientes, em particular nas fases em que a rapidez e eficácia de troca de informações é essencial, como é o caso da fase do planeamento. Nesta dissertação, será apresentado um conjunto de ferramentas de planeamento e gestão que tem como objetivo controlar o tempo e o custo ao longo da construção, e a integração destas com o BIM 4D e 5D. Como exemplo prático, modelou-se um edifício multifamiliar em Revit, nomeado de “Edifício 25 de Abril”, situado em Cascais. Foram modeladas as especialidades de Arquitetura e Estruturas, onde se aplicou o clash-detection e realizou o faseamento construtivo. Efetuou-se ainda, uma análise temporal, Instante 1 e Instante 2, entre o modelo tridimensional, o planeamento do projeto e o custo da construção, a partir da integração dos softwares, Revit (Dynamo) e Excel. E obteve-se, como resultado, modelos coloridos para o Instante 1 e Instante 2, onde é possível aferir o estado e o custo da construção. A adoção da metodologia BIM permitiu a agregação de várias informações relevantes ao desenvolvimento do projeto, potenciando a antecipação de possíveis problemas em obra, como por exemplo a compatibilização ou erros nos projetos, e ainda um conjunto de ferramentas que permitirão uma gestão de tempos e custos durante a construção.por
dc.description.abstractInformation technologies have evolved significantly, influencing, in a more or less homogeneous way, all sectors. The construction sector is no exception, but faces some technological challenges, namely in the use of separate software, which translates into an obstacle to the productivity of the sector. The BIM (Building Information Modeling) comes up as a technology trying to answer this problem. It consists of a collaborative and multidisciplinary development process, where a digital model is obtained with all the information from each party involved in the project, throughout the whole project lifecycle. In an ever more competitive market, construction companies need automation and computerization of tasks and processes, as well as more efficient methods in phases, where the speed and efficiency of information exchange is essential, as is the case with the planning phase. In this thesis, a set of planning and management tools will be presented, with the objective of controlling the time and cost, and the integration of these with BIM 4D and 5D. As a practical example, a multi-family building was modelled in Revit, named “Edifício 25 de Abril”, located in Cascais. Two specialties were modelled, Structure and Architecture, the clash-detection and constructive phasing were applied to the model. Time-analysis Instant 1 and Instant 2 were conducted between the three-dimensional model and the project planning, starting on the integration of multiple software, Revit (Dynamo) and Excel. As a result, colored models for Instants 1 and 2 were created, where it is possible to observe the state and cost of the construction at Instants 1 and 2 relative to the project planning. It is understood then that the use of the BIM methodology in scope of this thesis, allowed the aggregation of information relevant to the project development of the project, the potential to anticipate possible construction issues, as an example, the compatibility or project errors, in addition to a set of tools that allow the time and cost management throughout the construction lifecycle.por
dc.language.isoporpor
dc.rightsopenAccesspor
dc.subjectPlaneamento da construçãopor
dc.subjectGestão da construçãopor
dc.subjectBIM 4Dpor
dc.subjectBIM 5Dpor
dc.subjectDynamopor
dc.subjectProject planningpor
dc.subjectConstruction managementpor
dc.titleUtilização do BIM na otimização do planeamento e controlo das construçõespor
dc.typemasterThesiseng
dc.identifier.tid202595870por
thesis.degree.grantorUniversidade do Minhopor
sdum.degree.grade16 valorespor
sdum.uoeiEscola de Engenhariapor
dc.subject.fosEngenharia e Tecnologia::Engenharia Civilpor
Aparece nas coleções:BUM - Dissertações de Mestrado
C-TAC - Dissertações de Mestrado

Ficheiros deste registo:
Ficheiro Descrição TamanhoFormato 
Dissertação Bruno Miguel Serino Vaz.pdf5,97 MBAdobe PDFVer/Abrir

Partilhe no FacebookPartilhe no TwitterPartilhe no DeliciousPartilhe no LinkedInPartilhe no DiggAdicionar ao Google BookmarksPartilhe no MySpacePartilhe no Orkut
Exporte no formato BibTex mendeley Exporte no formato Endnote Adicione ao seu ORCID