Utilize este identificador para referenciar este registo:
https://hdl.handle.net/1822/71140
Título: | Life-cicle analysis towards a proactive time of first repair for such coastal RC bridges designed with prescriptive durability provisions |
Autor(es): | Faroz, Sharvil Alex Coelho, Mário Rui Freitas Santos, Carlos Matos, José C. |
Palavras-chave: | Corrosion Remaining-life analysis Reinforced concrete Time of repair |
Data: | Mar-2021 |
Editora: | The Associated Cement Companies Limited |
Revista: | The Indian Concrete Journal (ICJ) |
Resumo(s): | Prescriptive durability provisions have been used worldwide for designing concrete structures. Such structures are found to have deteriorated prematurely (unpredicted and suddenly), requiring expensive repairs. In this paper a probabilistic life-cycle deterioration analysis is performed for an upcoming coastal reinforced concrete bridge in India to proactively estimate the time of its first repair. This information is of utmost importance, particularly to support bridge managers defining the budget allocations for maintenance scenarios. This analysis also highlights the inadequacy of the current prescriptive provisions and the importance of adopting the probabilistic durability design for new infrastructures in the future. |
Tipo: | Artigo |
URI: | https://hdl.handle.net/1822/71140 |
ISSN: | 0019-4565 |
Versão da editora: | https://www.icjonline.com/explore_journals/2021/03 |
Arbitragem científica: | yes |
Acesso: | Acesso restrito autor |
Aparece nas coleções: | ISISE - Artigos em Revistas Internacionais |
Ficheiros deste registo:
Ficheiro | Descrição | Tamanho | Formato | |
---|---|---|---|---|
Paper 2354 (R2).pdf Acesso restrito! | 698,87 kB | Adobe PDF | Ver/Abrir |