Utilize este identificador para referenciar este registo: https://hdl.handle.net/1822/82152

Registo completo
Campo DCValorIdioma
dc.contributor.advisorSilva, João Pedro Mendonça de Assunção dapor
dc.contributor.advisorAzenha, Miguelpor
dc.contributor.advisorPires, Miguelpor
dc.contributor.authorVale, Daniel da Silvapor
dc.date.accessioned2023-01-24T12:52:42Z-
dc.date.available2023-01-24T12:52:42Z-
dc.date.issued2022-09-20-
dc.date.submitted2022-06-
dc.identifier.urihttps://hdl.handle.net/1822/82152-
dc.descriptionDissertação de mestrado em Engenharia Mecânicapor
dc.description.abstractNas últimas décadas, a indústria da Arquitetura, Engenharia e Construção (AEC) apresentou uma ineficiência elevada, quando comparada a outras indústrias. Alguns dos fatores que contribuíram, para a queda abrupta do setor, estavam relacionados com a má interpretação de informação técnica, aos erros sistemáticos e às omissões nos projetos, que se refletiam num incremento do custo final do projeto. O presente estudo surge na tentativa de demonstrar que esse desperdício existente do setor construtivo pode ser colmatado com recurso à integração de tecnologias BIM. Em Portugal, muitas empresas já beneficiam das potencialidades dos BIM, mas existe ainda caminho a percorrer. Nesse contexto, a implementação BIM no Grupo CASAIS tem contribuído para a melhoria dos processos com impacto direto na redução de prazos, mitigação de erros no fabrico e antecipação de incompatibilidades em fase de obra, bem como impactos na consequente evolução tecnológica. Por forma a evoluir na sua capacidade e valências BIM, a empresa está neste momento a investir significativamente no núcleo de Pré-Construção. A Pré-Construção, com recurso às técnicas de Multi Trade Prefabrication (MTP), assume um papel crucial na industrialização da construção, uma vez que permite o desenvolvimento de diferentes atividades em simultâneo e possibilita a sistematização de tarefas comuns a diferentes projetos de construção, conduzindo à redução do tempo total de trabalho. No presente estudo aborda-se a implementação das técnicas de Pré-Fabricação e Construção Modular direcionadas para os sistemas mecânico, elétrico e de águas (MEP), num trecho de um corredor de um edifício, verificando os prós e os contras deste processo construtivo. Para tal, procurou-se desenvolver um rack capaz de suportar todos os componentes dos sistemas dos projetos MEP e verificando as mais valias da sua criação. Numa fase seguinte, replicou-se o trabalho efetuado numa outra obra, passando pelas fases de projeto, conceção e implementação dos racks.por
dc.description.abstractIn recent decades, the Architecture, Engineering and Construction (AEC) industry has shown high inefficiency when compared to other industries. Some of the factors that contributed to the abrupt fall in the sector were related to the misinterpretation of technical information, systematic errors and omissions in the projects, which were reflected in an increase in the final cost of the project. The present study appears in an attempt to demonstrate that this existing waste in the construction sector can be filled with the use of the integration of BIM technologies. In Portugal, many companies already benefit from the potential of BIM, but there is still a way to go. In this context, the BIM implementation in the CASAIS Group has contributed to the improvement of processes with a direct impact on reducing deadlines, mitigating manufacturing errors and anticipating incompatibilities in the construction phase, as well as impacts on the consequent technological evolution. In order to improve its BIM capacity and capabilities, the company is currently investing significantly in the Pre-Construction core. Pre-Construction, using Multi Trade Prefabrication (MTP) techniques plays a crucial role in the industrialization of construction, as it allows the development of different activities simultaneously and enables the systematization of tasks common to different construction projects, leading to a reduction in total working time. The present study addresses the implementation of Prefabrication and Modular Construction techniques aimed at mechanical, electrical and water systems (MEP), in a section of a building corridor, verifying the pros and cons of this construction process. To this end, we sought to develop a rack capable of supporting all the components of the MEP projects systems and verifying the benefit of its creation. In a next phase, the work carried out in another work was replicated, going through the design, design and implementation phases of the racks.por
dc.language.isoporpor
dc.rightsopenAccesspor
dc.rights.urihttp://creativecommons.org/licenses/by/4.0/por
dc.subjectBuilding Information Modeling (BIM)por
dc.subjectPré-fabricaçãopor
dc.subjectPré-construção modularpor
dc.subjectMódulo MEPpor
dc.subjectRackpor
dc.subjectPrefabricationpor
dc.subjectModular pre-constructionpor
dc.subjectMEP modulepor
dc.titleIndustrialização de instalações de edifícios: a pré-construção modular utilizando princípios BIMpor
dc.typemasterThesiseng
dc.identifier.tid203087968por
thesis.degree.grantorUniversidade do Minhopor
sdum.degree.grade18 valorespor
sdum.uoeiEscola de Engenhariapor
dc.subject.fosEngenharia e Tecnologia::Engenharia Mecânicapor
Aparece nas coleções:BUM - Dissertações de Mestrado
ISISE - Dissertações de Mestrado

Ficheiros deste registo:
Ficheiro Descrição TamanhoFormato 
Daniel da Silva Vale.pdf5,61 MBAdobe PDFVer/Abrir

Este trabalho está licenciado sob uma Licença Creative Commons Creative Commons

Partilhe no FacebookPartilhe no TwitterPartilhe no DeliciousPartilhe no LinkedInPartilhe no DiggAdicionar ao Google BookmarksPartilhe no MySpacePartilhe no Orkut
Exporte no formato BibTex mendeley Exporte no formato Endnote Adicione ao seu ORCID