Utilize este identificador para referenciar este registo: https://hdl.handle.net/1822/91502

TítuloIndustrialização e transformação digital da construção: desenvolvimento de propostas para integração de informação de produção e obra
Outro(s) título(s)Industrialization and digital transformation of construction: development of proposals for the integration of production and work information
Autor(es)Sá, Rui Filipe Araújo
Orientador(es)Couto, J. Pedro
Palavras-chaveBuilding Information Modeling (BIM)
Planeamento da construção (4D)
Custos (5D)
Autos de medição
Sub-empreiteiros
Revit
Construction planning (4D)
Costs (5D)
Measurement records
Subcontractors
Data18-Dez-2023
Resumo(s)A presente dissertação tem como objetivo primordial a aproximação do BIM académico ao BIM realmente empregue em meio empresarial, procurando elaborar uma nova forma de controlo de autos de medição, bem como simplificar a interação entre os demais intervenientes de uma obra com recurso a vistas sequenciais 3D produzidas exclusivamente no software Revit. O setor da construção civil é um ambiente altamente competitivo e em constante evolução, tanto em termos de métodos construtivos quanto de técnicas de gestão e de controlo dos empreendimentos. As empresas continuam a procurar melhorar os seus sistemas de gestão e controlo, a fim de reduzir despesas e perdas de tempo que não lhes acrescentam valor. Surge assim a metodologia BIM (Building Information Modeling), com recurso ao software Revit, como ferramenta de controlo dos autos de medição. Os autos de medição dos trabalhos executados constituem um dos mais relevantes instrumentos de controlo físico e financeiro da obra, na medida em que permitem detetar desvios aos planos de trabalhos em vigor e confirmar as quantidades dos trabalhos e correlativos montantes para efeitos de pagamento das verbas constantes nas faturas ulteriormente apresentadas pelo subempreiteiro. Este trabalho foi realizado em contexto empresarial, na empresa building information modeling +, do grupo dst, s.a. e no decorrer do estágio foi possível acompanhar os trabalhos de execução de um empreendimento de uma residência universitária, servindo esta de caso de estudo. Para alcançar os objetivos pretendidos com este estudo fez-se recurso a modelos BIM de execução de obra, modelados e disponibilizados pela instituição. Para além do estudo e do desenvolvimento de propostas para integração de informação de produção e obra, foi desenvolvido para a empresa um template de tabelas de modo a servir as necessidades de cada uma das especialidades para utilização nas fases de planeamento, de execução e em estudos futuros, de custos.
The main objective of this dissertation is to bring academic BIM closer to BIM actually used in a business environment, seeking to develop a new way of controlling measurement records, as well as simplifying the interaction between the other participants in a project using sequential 3D views. produced exclusively in Revit software. The civil construction sector is a highly competitive and constantly evolving environment, both in terms of construction methods and techniques for managing and controlling projects. Companies continue to seek to improve their management and control systems in order to reduce expenses and waste of time that do not add value to them. This gave rise to the BIM (Building Information Modeling) methodology, using the Revit software, as a tool for controlling measurement records. The records of measurement of the works carried out are one of the most relevant instruments of physical and financial control of the work, insofar as they allow the detection of deviations from the work plans in force and confirm the quantities of the works and corresponding amounts for the purpose of paying the constant sums on the invoices subsequently submitted by the subcontractor. This work was carried out in a business context, at the company building information modeling +, part of the dst group, s.a. and during the internship it was possible to follow the execution work carried out on a university residence project, which served as a case study. To achieve the intended objectives of this study, BIM models for construction work were used, modeled and made available by the institution. In addition to the study and development of proposals for the integration of production and construction information, a table template was developed for the company to meet the needs of each of the specialties for use in the planning, execution and costs in future study phases.
TipoDissertação de mestrado
DescriçãoDissertação de mestrado integrado em Engenharia Civil
URIhttps://hdl.handle.net/1822/91502
AcessoAcesso aberto
Aparece nas coleções:BUM - Dissertações de Mestrado
DEC - Dissertações de Mestrado

Ficheiros deste registo:
Ficheiro Descrição TamanhoFormato 
Rui Filipe Araujo Sa.pdfDissertação de mestrado2 MBAdobe PDFVer/Abrir

Este trabalho está licenciado sob uma Licença Creative Commons Creative Commons

Partilhe no FacebookPartilhe no TwitterPartilhe no DeliciousPartilhe no LinkedInPartilhe no DiggAdicionar ao Google BookmarksPartilhe no MySpacePartilhe no Orkut
Exporte no formato BibTex mendeley Exporte no formato Endnote Adicione ao seu ORCID