Desenho e implementação de uma linha de montagem com rumo ao aumento da eficiência operacional
Assembly line design and implementation aiming at the increase of operational efficiency
| dc.contributor.advisor | Sousa, Rui M. | por |
| dc.contributor.author | Silva, Diogo Alberto Ferreira da | por |
| dc.date.accessioned | 2025-01-27T16:10:54Z | |
| dc.date.available | 2025-01-27T16:10:54Z | |
| dc.date.issued | 2024-11-19 | |
| dc.date.submitted | 2024-11 | |
| dc.description.abstract | O presente projeto de dissertação, enquadrado no âmbito do Mestrado em Engenharia e Gestão Industrial, foi desenvolvido numa empresa de Printed Circuit Board Assembly (PCBA) em colaboração com o Kaizen Institute, tendo como principal objetivo a substituição do subsistema produtivo de um dos clientes da empresa por um de maior desempenho face a uma redução de quase 50% na procura. O sucesso deste objetivo foi medido pela capacidade de reduzir o espaço ocupado no chão de fábrica, de reduzir o número de trabalhadores, de aumentar a produtividade para 12 peças/h-h, de estabilizar a taxa de defeitos para valores inferiores a 0,2% e de reduzir a quantidade de WIP no chão de fábrica. Desta forma, começou-se por analisar detalhadamente o sistema produtivo da empresa identificando o sobredimensionamento da força de trabalho, a baixa produtividade dos trabalhadores, a existência de um layout inadequado que promovia movimentações desnecessárias e grandes quantidades de work-in process no chão de fábrica. Seguiu-se o desenho e implementação de ações de melhoria para eliminar os desperdícios encontrados e racionalizar o processo produtivo. Foi desenhada uma linha de produção tendo por base um balanceamento de operações e o One-piece Flow que permitiu reduzir o número de trabalhadores de 15 para 8, gerando uma poupança anual de 99.431,50 €. As alterações físicas ao espaço, que substituíram as mesas de trabalho por uma linha de produção em “U”, libertaram 84,44 m², consolidando a produção em 35,56 m². A criação de fluxo entre a logística e a produção com a implementação do TFM e do novo processo produtivo, aumentaram a produtividade em 87% de 5,9 peças/h-h para 11 peças/h-h. Além disso, diminuiu-se drasticamente o WIP no chão de fábrica, de 1000 para 218 placas e de 2000 para 4 peças intermédias. As alterações efetuadas permitiram aumentar significativamente a eficiência operacional da empresa. | por |
| dc.description.abstract | This dissertation project, developed as part of the Master's in Industrial Engineering and Management, was carried out at a Printed Circuit Board Assembly (PCBA) company in collaboration with Kaizen Institute. Its main objective was to replace the production subsystem of one of the company's key clients with a higher-performing one, in response to a nearly 50% reduction in customer demand. The success of this objective was measured by the ability to reduce the floor space occupied, the distance traveled, the number of workers, increase productivity to 12 units/h-h, concentrate the defect rate to values below 0.2%, and reduce the amount of WIP (Work-In-Process) on the shop floor. To begin, a detailed analysis of the company’s production system was conducted, identifying issues such as an oversized workforce, low worker productivity, an inadequate layout that promoted unnecessary movements, and large amounts of work-in-process on the shop floor. This was followed by the design and implementation of improvement actions to eliminate identified waste and streamline the production process. A production line was created and balanced based on One-piece Flow, which allowed the reduction of workers from 15 to 8, generating an annual saving of €99,431.50. Physical changes to the space, which replaced workbenches with a "U" production line, freed up 84.44 m², consolidating production into 35.56 m². The creation of flow between logistics and production with the implementation of TFM and the new production process increased productivity by 87%, from 5.9 units/h-h to 11 units/h-h. Additionally, WIP on the shop floor was drastically reduced, from 1,000 to 218 boards and from 2,000 to 4 intermediate pieces. These changes significantly improved the company's operational efficiency. | por |
| dc.identifier.tid | 203757076 | por |
| dc.identifier.uri | https://hdl.handle.net/1822/94638 | |
| dc.language.iso | por | por |
| dc.rights | openAccess | por |
| dc.rights.uri | http://creativecommons.org/licenses/by-nd/4.0/ | por |
| dc.subject | Lean manufacturing | por |
| dc.subject | Melhoria contínua | por |
| dc.subject | Total flow management | por |
| dc.subject | Balanceamento | por |
| dc.subject | Mizusumashi | por |
| dc.subject | One-piece flow | por |
| dc.subject | Continuous improvement | por |
| dc.subject | Balancing | por |
| dc.subject.fos | Engenharia e Tecnologia::Outras Engenharias e Tecnologias | por |
| dc.title | Desenho e implementação de uma linha de montagem com rumo ao aumento da eficiência operacional | por |
| dc.title.alternative | Assembly line design and implementation aiming at the increase of operational efficiency | por |
| dc.type | masterThesis | eng |
| dspace.entity.type | Publication | en |
| sdum.degree.grade | 17 valores | por |
| sdum.uoei | Escola de Engenharia | por |
| thesis.degree.grantor | Universidade do Minho | por |
| thesis.degree.name | Dissertação de mestrado em Engenharia e Gestão Industrial | por |
Ficheiros
Pacote original
1 - 1 de 1
A carregar...
- Nome:
- Diogo Alberto Ferreira da Silva.pdf
- Tamanho:
- 4.73 MB
- Formato:
- Adobe Portable Document Format
- Descrição:
- Dissertação de mestrado