Life cycle analysis of a steel railway bridge over the operational period considering different maintenance scenarios: application to a case study

dc.contributor.authorFernandes, João Nuno Duartepor
dc.contributor.authorMatos, José C.por
dc.contributor.authorSousa, Hélder S.por
dc.contributor.authorCoelho, Mário Rui Freitaspor
dc.date.accessioned2022-04-01T13:37:38Z
dc.date.available2022-04-01T13:37:38Z
dc.date.issued2022-03-11
dc.date.submitted2021-09-21
dc.description.abstractIn the context of bridge management, three main types of maintenance actions can be considered. Maintenance actions can be taken preventively before the predefined limit condition is reached, or as a corrective measure in case those limits have been reached. The third possibility corresponds to the so-called “doing nothing” scenario, in which no action is taken on the bridge. To be able to implement preventive maintenance, it is necessary to know the current condition of the bridge, as well as to be able to predict its performance. On the other hand, it is also important to be able to identify potentially threatening events that might occur in the analysis life period. This paper describes an integrated methodology to help bridge managers in defining an efficient maintenance program, considering the specific case of a railway bridge. The novelty of the methodology is focused on updating an existing methodology proposed by COST TU1406, by extending it to railway bridges and also by including the resilience analysis in case of a sudden event occurrence. The analysis considers a multi-hazard future scenario, in which a flood event occurs while corrosion phenomena were already in place. The results show the feasibility of the proposed methodology as a support for the establishment of an efficient maintenance schedule to prevent bridge severe degradation, as well as to establish recovery plans in case of a sudden event.por
dc.description.sponsorshipThis work was partly financed by FCT/MCTES through national funds (PIDDAC) under the R&D Unit Institute for Sustainability and Innovation in Structural Engineering (ISISE), reference no. UIDB/04029/2020; HYPER FCT–Por tuguese Scientific Foundation, research grant no. PD/BD/ 128015/2016, under the Ph.D. program “Innovation in Railway System and Technologies-iRail” of the author João N.D. Fernandes; and European Union’s Horizon 2020 re search and innovation programme, grant agreement no. 769255. ,e authors would like to thank the Portuguese company “Infraestruturas de Portugal (IP)” for providing the case study as well as the inspection reports.por
dc.distributioninternationalpor
dc.identifier.articlenumber3010001por
dc.identifier.citationJoão N. D. Fernandes, José C. Matos, Hélder S. Sousa, Mário R. F. Coelho, "Life Cycle Analysis of a Steel Railway Bridge over the Operational Period considering Different Maintenance Scenarios: Application to a Case Study", Advances in Civil Engineering, vol. 2022, Article ID 3010001, 18 pages, 2022. https://doi.org/10.1155/2022/3010001por
dc.identifier.doi10.1155/2022/3010001por
dc.identifier.eissn1687-8094por
dc.identifier.issn1687-8086por
dc.identifier.urihttps://hdl.handle.net/1822/76741
dc.language.isoengpor
dc.peerreviewednopor
dc.publisherHindawi Publishing Corporationpor
dc.relationUIDB/04029/2020por
dc.relationPD/BD/128015/2016por
dc.relation.publisherversionhttps://www.hindawi.com/journals/ace/contents/por
dc.rightsopenAccesspor
dc.subjectLife cycle analysispor
dc.subjectSteel railway bridgepor
dc.subject.fosEngenharia e Tecnologia::Engenharia Civilpor
dc.subject.wosScience & Technologypor
dc.titleLife cycle analysis of a steel railway bridge over the operational period considering different maintenance scenarios: application to a case studypor
dc.typearticle
dspace.entity.typePublicationen
oaire.citationEndPage18por
oaire.citationStartPage1por
oaire.citationVolume2022por
sdum.journalAdvances in Civil Engineeringpor

Ficheiros

Pacote original

A mostrar 1 - 1 de 1
A carregar...
Nome:
3010001.pdf
Tamanho:
2.58 MB
Formato:
Adobe Portable Document Format
Descrição:
Life Cycle Analysis of a Steel Railway Bridge over the Operational Period considering Different Maintenance Scenarios: Application to a Case Study