Two-stage multiobjective optimization of maintenance scheduling for pavements

dc.commentshttp://ctac.uminho.pt/node/2545
dc.contributor.authorDenysiuk, Romanpor
dc.contributor.authorMoreira André V.por
dc.contributor.authorMatos, José C.por
dc.contributor.authorOliveira, Joelpor
dc.contributor.authorSantos, Adrianapor
dc.date.accessioned2017-01-13T14:45:34Z
dc.date.issued2017
dc.description.abstractPavements heavily influence the management costs in highway networks. Operating pavements represents a challenging task 6 involving complex decisions on the application of maintenance actions to keep them at a reasonable level of performance. The major diffi- 7 culty in applying computational tools to support decision making lies in a large number of pavement sections as a result of a high length of 8 road networks. This paper addresses maintenance scheduling for pavements by consolidating this task into two stages. In each stage, multi- 9 objective optimization is used to optimize maintenance schedules. The main motivation is to obtain a computationally treatable model for 10 large road networks. The first stage is defined by a collection of pavement sections composing the road network. In this stage, the performance 11 and maintenance models are addressed. These models account for uncertainties in the future performance and effects of maintenance by 12 defining model parameters as random variables. The second stage refers to combining maintenance schedules for individual sections to 13 determine the optimal maintenance plan at the network level. The results obtained for the real road network demonstrate the validity 14 and usefulness of the proposed framework. Moreover, this framework is general and can be extended to different types of infrastructure 15 assets.por
dc.description.sponsorshipThe authors wish to thank ANI (“Agência Nacional de Inovação”) for the financial support given to the R&D project “SustIMS - Sustainable Infrastructure Management Systems” (FCOMP-01718 0202- FEDER-023113), through the Operational Programme for Competitiveness Factors (COMPETE); and FCT (“Fundação para a Ciência e a Tecnologia”) for the Ph.D. scholarship (reference to SFRH/BD/85984/2012).por
dc.distributioninternationalpor
dc.identifier.doi10.1061/(ASCE)IS.1943-555X.0000355por
dc.identifier.eissn1943-555Xpor
dc.identifier.issn1076-0342por
dc.identifier.urihttps://hdl.handle.net/1822/44306
dc.language.isoengpor
dc.peerreviewedyespor
dc.publisherAmerican Society of Civil Engineers (ASCE)por
dc.relationinfo:eu-repo/grantAgreement/FCT/SFRH/SFRH%2FBD%2F85984%2F2012/PT
dc.rightsrestrictedAccesspor
dc.subjectPavementpor
dc.subjectMaintenance schedulingpor
dc.subjectMultiobjective optimizationpor
dc.subjectEvolutionary algorithmspor
dc.subject.wosScience & Technologypor
dc.titleTwo-stage multiobjective optimization of maintenance scheduling for pavementseng
dc.typearticle
dspace.entity.typePublicationen
oaire.citationEndPage11por
oaire.citationIssue3por
oaire.citationStartPage1por
oaire.citationTitleASCE's Journal of Infrastructure Systemspor
oaire.citationVolume23por
sdum.journalAsce's Journal of Infrastructure Systemspor

Ficheiros

Pacote original

A mostrar 1 - 1 de 1
A carregar...
Nome:
IS-ISENG-1013_AUTHOR_1.pdf
Tamanho:
1.15 MB
Formato:
Adobe Portable Document Format