TítuloPlaneamento e controlo de projetos de construção com recurso ao BIM
Outro(s) título(s)Planning and control of construction projects using BIM
Autor(es)Poças, Ana Rita Fernandes
Orientador(es)Couto, J. Pedro
Palavras-chaveBuilding information modeling (BIM)
Planeamento construtivo
BIM 4D
Estimativa de custos
BIM 5D
Construction planning
Average cost
Data2015
Resumo(s)Atualmente, o Building Information Modeling (BIM) é reconhecido como uma metodologia inovadora que pretende modernizar a indústria da arquitetura, engenharia e construção (AEC). O conceito geral do BIM visa proporcionar uma metodologia de elaboração de projetos holística, integrando uma série de tecnologias, políticas e processos colaborativos de apoio à gestão de projetos de construção. Através de um modelo digital é possível construir e gerir virtualmente o projeto durante todo o seu ciclo de vida. A adoção destas metodologias, por oposição às abordagens tradicionais de gestão de projetos, pode justificar-se pelo facto de os métodos tradicionais apresentarem, ainda hoje, muitas dificuldades e problemas relacionados com a falta de comunicação entre os vários intervenientes, com a baixa produtividade nos seus processos, entre outros. No entanto, a adoção do BIM não se verifica de forma generalizada. Alguns estudos realizados em diferentes países revelam que são poucos os profissionais do setor que adotaram ferramentas BIM e, desses profissionais, a grande maioria apenas as utiliza como ferramentas de desenho, aproveitando as suas funções de representação em 3 dimensões. Vários autores defendem, ainda, que só é possível usufruir da totalidade dos benefícios inerentes à utilização das ferramentas BIM quando estas são aplicadas a todo o ciclo de vida do projeto Desta forma, é de grande interesse o estudo das funcionalidades desta tecnologia no setor empresarial e como as suas funcionalidades e potencialidades poderão interagir com outros processos organizacionais tradicionais. Assim, o estudo desta dissertação centra-se na metodologia BIM aplicada ao planeamento e controlo de projetos de construção, através de um caso de estudo. O objetivo principal passa por contribuir para o desenvolvimento de processos mais eficientes no que diz respeito ao planeamento construtivo (BIM 4D) e à estimativa de custos (BIM 5D), utilizando metodologias BIM. Outro objetivo desta dissertação centra-se na análise da interoperabilidade de softwares BIM, ou seja, na verificação da viabilidade de exportação de dados dos modelos produzidos entre as ferramentas BIM.
The Building Information Modeling (BIM) is currently known as an innovative solution to modernize the architecture, engineering and construction industry (AEC). This concept provides an elaboration of the holistic design methodology, integrating a set of policies, technologies and collaborative processes that enable support to the management of the construction project and access to its data through a digital model, allowing to build and manage virtually the project through all its life cycle. The justification for the adoption of these more efficient methods, as opposed to traditional processes, relates to the fact that conventional processes, today, present many difficulties and problems associated with lack of communication between actors, low productivity in their processes, among others. However, the adoption of BIM does not occur in a general way. Studies in different countries reveals that only a minority of technicians of the sector experienced already BIM tools and, among these, the vast majority use them only as a drawing tool, taking advantage of their representative functions in 3 dimensions. Additionally, several authors argue that it’s only possible to take advantage of all the benefits inherent of using BIM tools when they are applied to the entire project life cycle. Thus, it is of great interest to study the features of this technology in the business sector and how its features and capabilities may interact with other traditional organizational processes. Thus, the study of this thesis focuses on the BIM methodology applied to the planning and control of construction projects, through a case study. The main objective becomes to contribute to the development of more efficient processes as regards the constructive planning (BIM 4D) and the estimated costs (BIM 5D) using BIM methodologies. Another objective of this dissertation focuses on reviewing the interoperability of BIM software, i.e., the verification of the data export viability of models produced between the BIM tools.
TipoDissertação de mestrado
DescriçãoDissertação de mestrado integrado em Engenharia Civil
URIhttps://hdl.handle.net/1822/40606
AcessoAcesso aberto
Aparece nas coleções:BUM - Dissertações de Mestrado
C-TAC - Dissertações de Mestrado

Ficheiros deste registo:
Ficheiro Descrição TamanhoFormato 
Tese_Ana Rita Poças_2015.pdf7,11 MBAdobe PDFVer/Abrir

Partilhe no FacebookPartilhe no TwitterPartilhe no DeliciousPartilhe no LinkedInPartilhe no DiggAdicionar ao Google BookmarksPartilhe no MySpacePartilhe no Orkut
Exporte no formato BibTex mendeley Exporte no formato Endnote Adicione ao seu ORCID